Labour Rates

Labour Rates

Labour Rates 2020

Hand digging and concreting holes$69.00/hole
Site modification
(i.e. – trimming trees/shrubs to allow for access to properly install)
$125.00/ hour Min 1.5 Hr Billing 
Router into existing post$10.00/hole
Service Call Or Job under 40 FT to mobilize Installer $250.00 
On site labour rate$125.00 flat per hour billing
Production Fee$149.00
Fence removal Costs Wood Only $5.00/ ft
City Landfill Disposal Costs *Determined by City of Regina * Based on Weight of Material Dumped $125.00/load on average 
Hauling Fee of Fence to Land Fill & Cost of Trailer use $99.00/Hr Flat Rate Per Load 
Mileage Rates Per Truck & Trailer $3.25/Km 
Concrete Required for use of Existing Holes $20.00/Hole 
**pricing subject to change with no notice**

We Accept E Transfer, Credit Card Payment, or Cash. We No Longer will accept any type of Cheques.